Assemblies Build



The JK Engineering manufacturing facility, and workflow throughout, has been organized following lean manufacturing principles. Lean manufacturing is applied across all operations from design engineering, tooling and parts manufacturing, through product assembly and inspection.


To meet the off-load needs of our customers, we offer a full range of sub-assembly integration services, including testing, qualification and certification of finished assemblies, supplier management and program management. In addition, we manufacture aerospace structures, components, and assemblies at every level of complexity – from machined parts to fully integrated mechanical assemblies.


Mechanical and Sub-Assemblies
  Assemble to drawing


Bearing installation
  Staking
  Swaging
  Ball Staking
  Proof-loading


Bushing Installation
  Shrink fit
  Press fit


Honing Service
  0.125 to  3.500 inside diameter. Hone bushing to final size per blueprint in house.


Ground Stud installation


Lock Wire Lanyard Assembly
  Safety Cable Assembly


Installation
  Heli-coil Inserts
  Lee Plugs
  Rosan Fittings
  Keenserts
  Nutplates
  Riveting Blind Rivets
  Blind Bolts
  Cherry Max
  Cherry Lock
  Hi-Shear
  Huck Bolts
  Hi-Lok


Adhesive Bonding


NAS / MS Hardware


Sheet Metal Assembly


Assembly Equipment

Helicoil Installation

Match Drilling & Tapping Assembly Level

Keensert Installation

Rapid Tapping Capabilities